Drawn towards the Orchard

Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
Drawn towards the Orchard
  • Oberwil
  • Located in Oberwil, Baselland, the multigenerational project reactivates a historic plot while preserving its apple and cherry trees. Two volumes form a V-shape along the hilly terrain, shaping an shared plateau with neighboring farmhouses and a exposed side toward the context.
  • The gradual ascent orchestrates the transition from public to private.
  • The linear entities respond in two directions with an open ground floor framing the Orchard, allowing the landscape to flow through the architecture.

Contributor: Basil Menzi
06 September 2026